Tuesday, 20 March 2007

Demolishing and virtual progress


OK we found a bit of spare time and attacked the bathroom with hammers. Result: removed the chimney and now have space to put in the bath.
















I have also brushed up on my ShipConstructor and AutoCAD skills to model the pipework that we are going to need to put in and to check that there will be space to fit all the items we want to get in. For the techies, the initial modelling was done using Maxsurf (during alpha-stage debugging). This was then exported to ShipConstructor (which runs inside AutoCAD to do the detailed modelling and pipe layouts.










Friday, 22 December 2006

Bagnere de Bigorre Bathroom Development

Welcome to Bagnere de Bigorre Bathroom Development.
This blog will track the progress of our bathroom renovation!



The room was originally a kitchen when the house was two apartments.

It had been painted a pretty bright red by the tenant in the 80s.



So far its been gutted, the ceiling pulled down and the old plaster removed from the walls ready to be lined and insulated (it gets cold here in the winter!)

We also have just had a new condensing boiler installed. The room is going to be split into two with a utility room on one side and the bathroom on the other. The boiler will end up in the utility room along with the washing machine and dryer.