Friday 22 December 2006

Bagnere de Bigorre Bathroom Development

Welcome to Bagnere de Bigorre Bathroom Development.
This blog will track the progress of our bathroom renovation!



The room was originally a kitchen when the house was two apartments.

It had been painted a pretty bright red by the tenant in the 80s.



So far its been gutted, the ceiling pulled down and the old plaster removed from the walls ready to be lined and insulated (it gets cold here in the winter!)

We also have just had a new condensing boiler installed. The room is going to be split into two with a utility room on one side and the bathroom on the other. The boiler will end up in the utility room along with the washing machine and dryer.